Skip to content
Report (COM(2025)0983 – C10-0339/2025 – 2025/0396(COD))

Suspending the application of the rules on extended producer responsibility for waste, waste electrical and electronical equipment and single use plastic waste (Omnibus VIII on environmental legislation)

A-10-2026-0267-AM-023-024

14.10.2026 A10-0267/23

Amendment 23

Anne-Sophie Frigout, Antonín Staněk, Ondřej Knotek, Jana Nagyová, Viktória Ferenc, Marie-Luce Brasier-Clain, Valérie Deloge, Mireia Borrás Pabón

on behalf of the PfE Group

Report A10-0267/2026

Ingeborg Ter Laak

(COM(2025)0983 – C10-0339/2025 – 2025/0396(COD))

Proposal for a directive

Recital 4 a (new)

Text proposed by the CommissionAmendment
(4a) The suspension of the administrative requirement concerning the appointment of an authorised representative introduced by this Directive should also be aimed at suspending the obligations of producers with regard to extended producer responsibility in their entirety until the issues relating to administrative burdens have been resolved.

Or. en

14.10.2026 A10-0267/24

Amendment 24

Anne-Sophie Frigout, Antonín Staněk, Viktória Ferenc, Marie-Luce Brasier-Clain, Valérie Deloge, Mireia Borrás Pabón

on behalf of the PfE Group

Report A10-0267/2026

Ingeborg Ter Laak

Suspending the application of the rules on extended producer responsibility for waste, waste electrical and electronical equipment and single use plastic waste (Omnibus VIII on environmental legislation)

(COM(2025)0983 – C10-0339/2025 – 2025/0396(COD))

Proposal for a directive

Article 1 – paragraph 1 – introductory part

Text proposed by the CommissionAmendment
The application of the following provisions is suspended until 1 January 2035:The application of Article 22a(3) of Directive 2008/98/EC is suspended, as regards producers established in the Union qualifying as microenterprises, small or medium enterprises, meaning those with fewer than 250 employees and which have an annual turnover not exceeding EUR 50 million or an annual balance sheet total not exceeding EUR 43 million, until 1 January 2035.

Or. en