11.6.2025 A10-0098/6

Amendment 6

Siegfried Mureşan, Isabel Benjumea Benjumea

on behalf of the PPE Group

Victor Negrescu, Costas Mavrides

on behalf of the S&D Group

Anouk Van Brug, Ľudovít Ódor

on behalf of the Renew Group

Damian Boeselager, Rasmus Andresen

on behalf of the Verts/ALE Group

Nikolas Farantouris, Jussi Saramo

on behalf of The Left Group

Report A10-0098/2025

Victor Negrescu, Siegfried Mureşan

Implementation report on the Recovery and Resilience Facility

(2024/2085(INI))

Motion for a resolution

Recital L a (new)

Motion for a resolutionAmendment
La. whereas according to the ECA, performance is a measure of the extent to which an EU-funded action, project or programme has met its objectives and provides value for money; whereas moreover, financing not linked to costs does not, in itself, make an instrument performance-based;

Or. en

11.6.2025 A10-0098/7

Amendment 7

Siegfried Mureşan, Isabel Benjumea Benjumea

on behalf of the PPE Group

Victor Negrescu, Costas Mavrides

on behalf of the S&D Group

Anouk Van Brug, Ľudovít Ódor

on behalf of the Renew Group

Damian Boeselager, Rasmus Andresen

on behalf of the Verts/ALE Group

Nikolas Farantouris, Jussi Saramo

on behalf of The Left Group

Report A10-0098/2025

Victor Negrescu, Siegfried Mureşan

Implementation report on the Recovery and Resilience Facility

(2024/2085(INI))

Motion for a resolution

Paragraph 47 a (new)

Motion for a resolutionAmendment
47a. Notes that the ECA considers that the RRF focuses on progress on implementation rather than performance, particularly because RRF-funded measures focus on outputs rather than results, vary in ambition, sometimes lack clarity and do not always cover a measure’s key implementation stages, including completion;

Or. en

11.6.2025 A10-0098/8

Amendment 8

Siegfried Mureşan, Isabel Benjumea Benjumea

on behalf of the PPE Group

Victor Negrescu, Costas Mavrides

on behalf of the S&D Group

Anouk Van Brug, Ľudovít Ódor

on behalf of the Renew Group

Damian Boeselager, Rasmus Andresen

on behalf of the Verts/ALE Group

Nikolas Farantouris, Jussi Saramo

on behalf of The Left Group

Report A10-0098/2025

Victor Negrescu, Siegfried Mureşan

Implementation report on the Recovery and Resilience Facility

(2024/2085(INI))

Motion for a resolution

Paragraph 67 a (new)

Motion for a resolutionAmendment
67a. Notes that, according to the ECA, it is essential that future performance-based instruments are not designed and implemented in a way that is detrimental to accountability and, in particular, that appropriate control systems are in place in the Member States and are checked by the Commission before implementation starts; notes that this would involve setting minimum requirements for the Member States’ controls and the Commission’s checks;

Or. en