Implementation report on the Recovery and Resilience Facility
11.6.2025 A10-0098/6
Amendment 6
Siegfried Mureşan, Isabel Benjumea Benjumea
on behalf of the PPE Group
Victor Negrescu, Costas Mavrides
on behalf of the S&D Group
Anouk Van Brug, Ľudovít Ódor
on behalf of the Renew Group
Damian Boeselager, Rasmus Andresen
on behalf of the Verts/ALE Group
Nikolas Farantouris, Jussi Saramo
on behalf of The Left Group
Report A10-0098/2025
Victor Negrescu, Siegfried Mureşan
Implementation report on the Recovery and Resilience Facility
(2024/2085(INI))
Motion for a resolution
Recital L a (new)
| Motion for a resolution | Amendment |
| La. whereas according to the ECA, performance is a measure of the extent to which an EU-funded action, project or programme has met its objectives and provides value for money; whereas moreover, financing not linked to costs does not, in itself, make an instrument performance-based; |
Or. en
11.6.2025 A10-0098/7
Amendment 7
Siegfried Mureşan, Isabel Benjumea Benjumea
on behalf of the PPE Group
Victor Negrescu, Costas Mavrides
on behalf of the S&D Group
Anouk Van Brug, Ľudovít Ódor
on behalf of the Renew Group
Damian Boeselager, Rasmus Andresen
on behalf of the Verts/ALE Group
Nikolas Farantouris, Jussi Saramo
on behalf of The Left Group
Report A10-0098/2025
Victor Negrescu, Siegfried Mureşan
Implementation report on the Recovery and Resilience Facility
(2024/2085(INI))
Motion for a resolution
Paragraph 47 a (new)
| Motion for a resolution | Amendment |
| 47a. Notes that the ECA considers that the RRF focuses on progress on implementation rather than performance, particularly because RRF-funded measures focus on outputs rather than results, vary in ambition, sometimes lack clarity and do not always cover a measure’s key implementation stages, including completion; |
Or. en
11.6.2025 A10-0098/8
Amendment 8
Siegfried Mureşan, Isabel Benjumea Benjumea
on behalf of the PPE Group
Victor Negrescu, Costas Mavrides
on behalf of the S&D Group
Anouk Van Brug, Ľudovít Ódor
on behalf of the Renew Group
Damian Boeselager, Rasmus Andresen
on behalf of the Verts/ALE Group
Nikolas Farantouris, Jussi Saramo
on behalf of The Left Group
Report A10-0098/2025
Victor Negrescu, Siegfried Mureşan
Implementation report on the Recovery and Resilience Facility
(2024/2085(INI))
Motion for a resolution
Paragraph 67 a (new)
| Motion for a resolution | Amendment |
| 67a. Notes that, according to the ECA, it is essential that future performance-based instruments are not designed and implemented in a way that is detrimental to accountability and, in particular, that appropriate control systems are in place in the Member States and are checked by the Commission before implementation starts; notes that this would involve setting minimum requirements for the Member States’ controls and the Commission’s checks; |
Or. en