Parliament's amended version of the Commission proposal to revise the Industrial Emissions Directive (Directive 2010/75/EU) and the Landfill Directive (1999/31/EC). It widens the scope to more installations, including large pig, poultry and cattle farms, large battery manufacturing and certain mining activities.¶¶¶ It tightens permit rules: emission limit values must be set at the strictest achievable level, environmental performance limit values become indicative, and permits must be reconsidered at least every 8 years.¶¶¶ It requires operators to run an audited environmental management system, publish it online, and for large energy-intensive installations to include transformation plans for 2030-2050.¶¶¶ It strengthens public access to permits and monitoring data, transboundary consultation, and the right of people harmed by violations to claim compensation.¶¶¶ It sets penalties of at least 4% of annual turnover for legal persons and requires Member States to use penalty revenue to compensate affected local communities.¶¶
Key points
- The Directive's title becomes 'on industrial and agricultural emissions', and it adds rules to improve resource efficiency and reduce use of water, energy and raw materials.¶¶
- New definitions cover olfactory pollution, environmental performance limit values, industrial and urban waste water treatment plants, water reuse, and extensive farming.¶¶¶
- Chapter VIa brings pig and poultry farms above 40 000 poultry places, 2 000 production pig places or 750 sow places, and farms of 750 livestock units or more, into scope.¶¶
- Large battery manufacturing installations are included, except those exclusively assembling battery modules and packs.¶¶
- Permits must be published online free of charge, with a uniform summary, and the Commission must adopt the summary format by 31 December 2024.¶¶
- Competent authorities must set the strictest achievable emission limit values and indicative environmental performance limit values, with derogations capped at five years and reassessed every five years.¶¶¶
- Operators must run an environmental management system audited at least every 3 years by an environmental verifier and publish it online.¶¶¶
- Operators of energy-intensive installations must include indicative transformation plans for 2030-2050 in their environmental management systems, with a delegated act on the format due by 30 June 2026.¶¶
- Member States must suspend operations that pose immediate danger to human health or drinking water, and inform affected drinking water and wastewater operators.¶¶
- Individuals harmed by violations can claim compensation, with courts able to order disclosure of evidence and to recognise clear and consistent scientific data on causality.¶¶¶
- Fines must be at least 4% of the operator's annual turnover in the financial year preceding the fine, and penalty revenue must compensate affected local communities.¶¶
- The Commission must adopt a delegated act listing the 200 most polluting installations by 30 June 2026 and review the Directive by 30 June 2028 and every 5 years.¶¶
Who is affected
- Large pig, poultry and cattle farms, which must obtain permits or registrations and meet operating rules.¶¶
- Battery manufacturers, whose large installations are brought into the Directive's scope.¶¶
- Operators of industrial installations, who must meet stricter permit conditions and run audited environmental management systems.¶¶
- Drinking water and wastewater operators, who must be consulted and informed of pollution incidents.¶¶¶
- People harmed by violations, who gain a right to claim compensation.¶
Figures and deadlines
- Permits must be reconsidered at least every 8 years.¶
- The Commission must adopt the permit summary format by 31 December 2024.¶
- Derogations from emission limit values are capped at a maximum of five years.¶
- Environmental management systems must be audited at least every 3 years.¶
- Transformation plans must be included by 30 June 2030, with the format delegated act due by 30 June 2026.¶¶
- Fines must be at least 4% of the operator's annual turnover.¶
- The Commission must list the 200 most polluting installations by 30 June 2026.¶
- Member States must bring permit conditions into line with operating rules within 42 months of the delegated act's entry into force.¶