Connecting Europe through high-speed rail
TA-10-2026-0351 · P10_TA(2026)0351 · PE785.224
- Adopted in plenary on · Adopted 558–23–73 · See the decision →
- Full procedure 2026/2003
Written by a language model from the full text only; every figure comes from the text. The paragraph links open the paragraph a statement rests on — check the text itself before relying on it.
Parliament's resolution welcomes the Commission's 2025 communication on high-speed rail and calls for an interoperable, accessible European network connecting capitals and regions, including peripheral and under-connected areas.¶¶¶ It asks for EU deployment objectives by 2027 and a 2040 modal-shift objective, competitive corridors at 250 km/h with ambition for 350 km/h, and simpler ticketing with onward-travel guarantees.¶¶¶ It calls for dedicated funding in the 2028-2034 multiannual financial framework, a European high-speed rail deal to close the EUR 345 billion investment gap, and faster ERTMS deployment.¶¶¶ It seeks a green industrial strategy for rail, stronger powers for the EU rail agency, climate resilience and safety reporting, and better access to service facilities and rolling stock.¶¶¶
Key points
- Calls for a European high-speed network serving all major urban nodes, with Commission mapping of uncovered areas, missing cross-border links and priorities for gradual integration.¶¶
- Says high-speed expansion must complement, not replace, conventional, regional, suburban and freight rail, backed by predictable long-term funding and a network-first approach.¶¶¶
- Asks TEN-T European Coordinators to identify missing links and underserved cross-border connections, with CEF and Interreg money for low-cost, high-impact projects.¶¶
- Calls on the Commission and Council to ensure dedicated high-speed funding in the 2028-2034 MFF and welcomes a coordinated high-speed rail deal financing strategy.¶¶
- Wants stations as intermodal hubs, bicycle carriage on high-speed trains, and cooperation with Norway, Switzerland and the United Kingdom to extend the network.¶¶¶
- Asks the Commission to set EU high-speed deployment objectives by 2027 and a 2040 modal-shift objective, after an impact assessment and respecting geographic specificities.¶
- Supports corridors at top speeds of at least 250 km/h with ambition for 350 km/h, subject to independent cost-benefit analyses, and explores express freight services.¶
- Welcomes the Passenger Package and expects comparable ticket offers and a legally enforceable onward-travel guarantee when connections are missed across operators.¶¶
- Calls for simpler permitting via one-stop shops and shorter approval timelines, and for ETS revenues, green bonds and other tools to finance high-speed rail.¶¶
- Calls for faster ERTMS delivery with binding milestones and penalties, EU-wide vehicle authorisation by 2027, and a strengthened, better resourced EU rail agency.¶¶
- Wants climate stress-testing for EU-funded rail projects from 2027, efficient heating and cooling in all rolling stock by 2040, and an EU-wide safety occurrence reporting system.¶¶
- Calls for a green industrial strategy for rail, procurement based on life-cycle costs, a risk assessment of critical suppliers, and fair access to depots and second-hand rolling stock.¶¶¶
Who is affected
- Member states: asked to align national transport and investment plans with TEN-T priorities and to assess expansion effects on conventional services.¶¶
- Rail passengers: should get affordable fares, transparent pricing, comparable tickets and onward-travel guarantees.¶¶
- Rail supply industry and manufacturers: targeted by the proposed green industrial strategy, procurement criteria and supply-chain risk assessment.¶¶¶
- Railway undertakings and new entrants: should gain fair access to service facilities, second-hand rolling stock and cross-border services.¶¶
- Peripheral, outermost and under-connected regions: connectivity to the core network treated as a structural entitlement.¶¶
Figures and deadlines
- EUR 345 billion: estimated high-speed rail investment gap to be closed by 2040.¶¶
- 68,1 %: fall in rail emissions between 1990 and 2019.¶
- EUR 45 billion: annual revenues of the rail supply industry and high-speed rail technologies.¶
- 1,3 million: workers employed in the EU rail sector.¶
- 2027: deadline for the Commission to set EU high-speed deployment objectives.¶
- 250 km/h and 350 km/h: minimum top speed supported for corridors and the ambition for connections.¶
- 2030, 2040 and 2050: binding ERTMS targets for the core, extended core and comprehensive networks.¶
- 2040: deadline for all rolling stock in service to have efficient heating, ventilation and air conditioning.¶