Sittings · Document
Increasing the efficiency of the EU guarantee under the InvestEU Regulation and simplifying reporting requirements
24.11.2025 A10-0117/8/rev
Amendment 8/rev
Sarah Knafo
on behalf of the ESN Group
Report A10-0117/2025
Aura Salla, Irene Tinagli
Increasing the efficiency of the EU guarantee under the InvestEU Regulation and simplifying reporting requirements
(COM(2025)0084 – C10-0036/2025 – 2025/0040(COD))
Proposal for a regulation
Article 1 – paragraph 1 – point 24 a (new)
Regulation (EU) 2021/523
Annex V – Section B – point 11
| Text proposed by the Commission | Amendment |
| (24a) In Annex V, Section B, point (11) is deleted. |
Or. en
Justification
Currently, “the decommissioning, operation, adaptation, or construction of nuclear power plants” is excluded from the Invest EU Fund in its Annex V. It is essential to add this technology in order to send a strong signal about our European priorities. This annex, which excludes nuclear power from the scope of investment, must be amended.